Tonggao Expressway starts from Haiyang South Road in the north and ends at the intersection of G204 national highway and Haiwu line in the south. Rugao section adopts the construction form of ground Expressway with the design speed of 100km / h, including road, bridge, traffic engineering and greening construction.