Located in Chonburi , Thailand, the project convers a floor are of 192,000 square meters, and includes the glue plant, office building, equipment foundation, water supply and drainage, electrical work, automatic control work, pre-buried power, buried drainage pipe of the rubber mixing workshop, TCB power station structure, PCR power station structure, fence, a temporary road on site.