Post-flood rehabilitation project for the Gamboma Bridge on No.2 National Highway of Congo (Brazzaville) passes final inspection

Pubtime:10.03.2025
【Font size:BigMidSmallPrint

Recently, the post-flood rehabilitation project for the Gamboma Bridge on No.2 National Highway of Congo (Brazzaville), undertaken by CSCEC, passed its final inspection.

刚果布.png

After heavy rainfall caused significant road damage, CSCEC quickly completed emergency repairs on the key sections of the road with engineering technologies and efficient construction. The project also systematically enhanced the region’s flood control capabilities and infrastructure resilience, ensuring the safe travel of local residents.


Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180