Tunnel boring machine for Nordau station-Arozorov station of Israel's Tel Aviv Light Rail Green Line Project launched

Pubtime:26.02.2024
【Font size:BigMidSmallPrint

Recently, the tunnel boring machine for the Nordau Station-Arozorov Station of Israel's Tel Aviv Light Rail Green Line Project, constructed by CSCEC, was successfully launched.


以色列特拉维夫绿线轻轨G3-2项目Nordau站-Arozorov站区间盾构机始发1.jpg


The launching ceremony

The tunnel boring machine measures 120 meters in length and has a diameter of 7.54 meters, segmented into nine sections.


以色列特拉维夫绿线轻轨G3-2项目Nordau站-Arozorov站区间盾构机始发2.jpg


The Tel Aviv Light Rail Green Line Project spans 39 kilometers, traversing the entire city of Tel Aviv and connecting Holon and Herzliya. The G3-2 section comprises the underground part of the Green Line, including the construction of a 5.7-kilometer-long twin-bore tunnel, two entry-exit ramps, one underground station, and three aboveground station boxes.


以色列特拉维夫绿线轻轨G3-2项目Nordau站-Arozorov站区间盾构机始发3.jpg


Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180